Capital Project

Capital Project:  REimagine ESM

Construction Updates

Capital Project

 

Thanks to the support of the Eastport-South Manor community, the School District has begun a $89.9 million dollar capital project that will see improvements to classrooms and infrastructure that will make ESM the crown jewel of school on Long Island.

Passed in a community vote on February 2, 2022, ESM has contracted with H2M, as our architectural, firm to design upgrades to all five of the District’s buildings. There will be STEAM classrooms added at the four elementary school buildings with new and improved inclusive playgrounds. Outdoor learning spaces will also be added with Maker Space learning areas in each Library, revamped art rooms and mechanical upgrades to HVAC systems, too.

The plan calls for a redesign to the Jr-Sr High School Library while including the addition of a student-run café and a completely redesigned and expanded physical education space. The revamped athletic/educational space will have a new wrestling room, weight training room, and a dance center with new and improved locker rooms. There will also be expansions and improvements to art and music spaces, security improvements at the main entrance and Special Education classroom labs for life skills students.

On the grounds at the Jr-Sr High School the plan calls for adding two new all-purpose turf fields, a turf baseball and softball field that will include new dugouts, bullpens, batting cages and stadium seating. All of which will include lights to expand playing time for our community youth teams. The plan also calls for adding an all-purpose turf field and a new full-sized competitive track at Dayton Avenue Elementary School, which will be dedicated to Junior High School athletics.

The capital work will also address much needed mechanical repairs at the Jr-Sr High School including a new metal roof, repairs to the HVAC dual pipe system and the repaving of the roadways and parking lots at the building.

All five ESMs building will also see new security guard booths with redesigned entrance and exits.

The School District has contracted with Park East Construction as its construction manager for the project. While planning for construction began in the summer of 2022, field and building work will begin in the summer of 2023 and will continue into 2025.

EPC

In an effort to take advantage of its large parking lots and open roofs, the Eastport-South Manor School District has launched a green energy project that will greatly reduce its energy costs while also providing sorely needed upgrades to its HVAC system.

The project, better known as an Energy Performance Contract (EPC), calls for the construction of solar carports and/or rooftop solar panels at all five of the District schools as well as lighting upgrades, energy efficient pipe and valve insulations and new weatherization. ESM has contracted with Johnson Controls Inc. to construct the project. Park East Construction is the construction manager for this project as well.

The solar panels will be the most visible part of the upgrades. They will produce electricity that will partially offset ESM’s electric bill. The District will also see interior and exterior lights replaced with state-of-the-art LED lights and fixtures that be significantly more efficient than the current lighting units that are in some areas comprised of decades old technology. The improved insultations and weatherization will also decrease energy needs.

The savings from this effort will be put towards purchasing two new chillers (air conditioners) at the Jr-Sr HS. The net impact to the budget is expected to reduce costs by more than a half million dollars a year. Construction is underway at all five buildings and is expected to be completed in late 2024. When finished, the project will be the second largest school district-owned solar project in New York State.

Frequently Asked Questions

  • Although the district has continued to make strong investments into its educational program, it has held off on major renovations and upgrades since our last bond, which was over 12 years ago. Although our buildings still provide safe learning environments, education has continued to evolve and many of our spaces need updates to meet today’s standards. The emergency repairs we have completed over time have helped to defer complete overhauls, until now, when many of our infrastructural systems have simply reached the end of their lifespans. For example, the boiler at Eastport dates to 1965 and the school’s original chalkboards are still in classrooms. By bonding the proposed projects together, we will be able to reimagine our facilities to address current realities and future demands in what the Board believes is a financially prudent manner. The proposal in this capital project bond referendum will address the critical infrastructural needs of our facilities, improve learning environments, resources for all students, and upgrade arts and athletic facilities.

  • A bond provides immediate funds for long-term capital projects, such as modernization of schools, completion of major building system updates and repairs. Unlike a regular budget, a bond is financed over a longer period of time, similar to a mortgage. The district pays off its bonds in an average of 15-20 years.

  • If approved by the community, each of the district’s school buildings will see considerable building improvements to both infrastructural and instructional spaces. The projects include significant security updates at the entrances of each of the elementary schools, enhancements to instructional spaces, including art, science, technology and libraries, and flooring, masonry and restroom updates to aid building efficiency. Additionally, the auditorium and theater spaces at the Junior-Senior High School will be updated to support the district’s robust arts program. Athletic spaces, including the outdoor fields, wrestling room, weight room, locker room and dance studio, will also be modified to benefit the needs of the district’s student-athletes of all ages. To address structural deficiencies, the asphalt shingle roof at the Junior-Senior High School will be replaced with a metal roof and mechanical updates will be made to address heating, air conditioning and ventilation challenges.

  • Capital improvements of this scale cannot be included in the operating budget without significantly impacting the tax levy. A bond spreads the cost out over a longer period of time, mitigating the annual tax impact and maximizing the use of New York State building aid, which for ESM is estimated to be about 72%. This means that the local cost of the project is cut almost to a third of the total cost of the project

  • The plan was conceptualized with input from the Facilities Advisory Committee and after careful analysis of the district’s five-year facilities plan. The District also received input from its Health, Safety and Security Committee and from community members during two special capital project forums.

  • The proposal will now be put before voters on Wednesday, Feb. 2. Polls will be open between 6 a.m. and 9 p.m. in Board Room 1220 at Eastport-South Manor Junior-Senior High School.

  • The district’s upcoming retiring debt, which was incurred from the construction of the Junior-Senior High School and Tuttle Avenue, presents an optimal opportunity for this project to be considered without significantly impacting the local tax burden. The new debt associated with the proposed bond will essentially replace the old debt. When coupled with the district’s 72% New York State Building Aid, it would allow the district to complete these much-needed, major renovations at a fraction of the total cost.

  • Due to a 72% building aid rate and retiring debt from previous bonds, there will only be a minimal tax increase in four of the 20 years of this bond. The annual impact on taxpayers will vary throughout the course of the bond based on the debt that is coming off the books. For some years, there will be no impact and in others there will be a slight increase or even a decrease. Below is a chart outlining the increase per $1,000 of the portion of a homeowner’s school taxes.

    2022-2023: $0

    2023-2024: $0

    2024-2025: $1.10

    2025-2026: $4.10

    2026-2027: $4.10

    2027-2028: $4.10

    2028-2029: -$5.40 (DECREASE)

    2029-2030: $0

    2030-2031: $0

    2031-2032: -$14.40 (DECREASE)

    This means, for example, if your school tax portion of the tax bill is $7,000, the first increase you will see would be in the 2024-2025 school year and come to $0.64 per month.

  • No. By law, the district is prohibited from spending above the amount approved by voters.

  • If approved by the community, the proposed bond projects will be submitted to the New York State Education Department for its required approval. Pending that process, it is expected the projects will begin in two phases, starting June 2023 and May 2024. It is anticipated all projects would be completed by September 2025.

  • Additional information about the proposed project can be found on the district’s website, Eastport South Manor